Ref. no | Qnty. | Description | Condition | |||||
Available 50Hz Gas Fired Power Plant assets. | ||||||||
0125109 | If you ever need any of the following, please let us know,so we arrange an offer for sale: 114MW Gas fired CCGT Power plant, unused/surplus. Built but never commissioned. 750MW Gas fired CCGT Power plant, unused/surplus. Built and commissioned. 1.500MW Gas fired CCGT power plant, unused/surplus. Partially built hence never got commissioned. And 440MW Gas fired CCGT Power island, unused/surplus. Never built 820MW Gas fired CCGT power Island, unused/surplus. Never built And, 2 of 125MW Gas Fired plant, based on Reciprocating engines, Wartsila built. And, We have several new/surplus/unused MAN 18V32/40 HFO burning 8,7MW gensets @ 50Hz available. Capacities as mentioned are ISO capacities! | unused/surplus. | ||||||
022552 | 4 | 22MW Gas-Engine power plant MITSUBISHI 18KU30GA 5500kw 720rpm 60hz, 11000V for sale Specification Item: GAS Engine Power plant Number: 4 sets Engine Maker: Mitsubishi Model: 18KU30GA Year: 2005 Output: 5500kw Engine speed: 720rpm Stroke: 380mm Generator Maker: NISHISHIBA Year: 2005 Output: 5500kw Voltage: 11000V Speed: 720rpm Frequency: 60Hz Phase: 3 Pole: 10 Boiler Maker: MIURA(Japan) Model: ECS-G590-12E Max steam quantity: 3027 kg/h | Year: 2005 | |||||
032555 | 1 | 373MW GE Frame9 HA 01 50HZ single cycled gas turbine set Turbine manufacturer GE Model 9HA 01 Rated capacity 372,646KW Generator manufacturer GE Generator type Hydrogen Cooled Frequency 50HZ Power factor 0.85 Scope of supply ‘ Full gas turbine package scope including Modulating IGVs Dry low NOX combustion Water injection for NOX control for liquid fuel opeartion Dual fuel system Gas/Distilate Fire protection system Starting system SPEEDRONIC Mark Vle control system More details will follow on request | Year of manufacturer 2015, Never used. | |||||
042505 | 2 | Two (2) GE 7FA.05, 60 Hz Natural Gas Turbine-Generators (GTG) Combustion Turbines, with DLN 2.6+ combustion technology equipped with a hydrogen cooled generators, GE Mark VIe control system, and ancillary equipment package for each GTG per highlights below (except LCI): Inlet Evaporative Cooler Water-to-Air Fin Fan Cooling 7FH2B Generator, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers Static Starter – one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs Exhaust stack with silencer: 19.5 feet diameter and 135 feet height Lube oil conditioner Complete GE engineering package • Performance (Based on Original Site Conditions) At original project site elevation: 59°F = 221 MW, 97°F = 212 MW Estimated at sea level: 59°F = 225 MW, 97°F = 217 MW NOx: 9 ppmvd@ 15% O2 CO: 5 ppmvd (90 – 100% load), 9 ppmvd (Min – 90% load) @ 15% O2 | Warranty – Factory new unit warranty – Insurable • Liquidated damages on performance/delay – Financeable – Supportive of EPC contracting for completion guarantees. | |||||
. | ||||||||
052505 | 1 | Siemens SST-300 Steam Turbine, Rolls-Royce Gas Turbine Generator Package. • 60MW AT SITE CONDITIONS • DLE Dry Low Emissions • Cold start to full power in under 10minutes • 50Hz, but easily convertible to 60Hz • Engine still preserved in original shipping container • An aeroderivative gas turbine. SIEMENS STEAM TURBINE GENERATOR SST-300 C2S/C160 • Output 17.92MW AT SITE CONDITIONS • Speed 7059 RPM • Admission Steam Temperature 400 Degrees C • Admission Steam Pressure 30 bara • Exhaust Pressure 0.07 bara • Rotation- Right; Seen in Steam Flow Direction | Zero “0” Hours, Never Used. Manufactured in 2016. | |||||