Combine Cycle Plants

Ref #       Quantity                            Description       Condition
010905             2 2-GE 7F.05 GTG packages (225mw ISO each)

  • Zero “0” Hours, Never Used
  • DLN 2.6+ Combustion Technology
  • GE Mark VIe Control System
  • Water-to-Air Fin Fan Cooling
  • 7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers
  • Static Starter – one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs
  • 2-Exhaust stacks with silencer: 19.5 feet diameter and 135 feet height
  • Ancillary equipment
  • Lube oil conditioner
  • Complete GE engineering package
TAI Exclusive
020905             1 1-GE 7F.05 GTG packages (225mw ISO) 

  • One GE 7F.05 Gas Turbine Generator Set
  • Built in 2014, Zero “0” Hours, Never Used
  • DLN 2.6+ Combustion Technology
  • GE Mark VIe Control System
  • Water-to-Air Fin Fan Cooling
  • 7FH2B Hydrogen Cooled Generators, 270 MVA, Lead PF .95, Lag PF .85, 229.5 MW, 18 kV, w/ SS coolers
  • Static Starter – one (1) Load Commutated Inverter (LCI) with cross-connect shared w/ GTGs
  • Ancillary equipment
  • Lube oil conditioner
TAI Exclusive
030905             1 TAI Exclusive: SGT6-5000F GTG package (200mw ISO) and Alstom STG (160mw ISO)=360MW in Combine Cycle. 1 on 1 Combined Cycle:     SGT6-5000F GTG package (200mw ISO) and Alstom STG (160MW ISO). GT Built in 2008 and STG Built in 2006, both never used=Zero “0” Hours
040905             1 1-Rolls-Royce Trent Turbine and 1 Siemens SST300 STG=77MW in Combine Cycle.

ROLLS ROYCE USA, OHIO MANUFACTURED TRENT 60 GAS TURBINE GENERATOR SET.

• Manufactured in 2016, delivered in August 2017
• 60MW AT SITE CONDITIONS
• DLE Dry Low Emissions
• Cold start to full power in under 10minutes
• 50Hz, but easily convertible to 60Hz
• Engine still preserved in original shipping container
• An aeroderivative gas turbine.

SIEMENS STEAM TURBINE GENERATOR SST-300 C2S/C160
• Output 17.92MW AT SITE CONDITIONS
• Speed 7059 RPM
• Admission Steam Temperature 400 Degrees C
• Admission Steam Pressure 30 bara
• Exhaust Pressure 0.07 bara
• Rotation- Right; Seen in Steam Flow Direction

Manufactured in 2016, delivered in August 2017
050905              1 1-GE LMS100 UNUSED PARTS- Brush Generator, Booster LPC, MarkVIe Controls and InterCooler (HTIC) LEFT

  • Never Used, Zero “0” Hours
  • Brush Generator BDAX98-330ERH, 133000KVA LEFT
  • Booster LPC LEFT
  • EnergyEn Intercooler (HTIC) LEFT
  • Mark VIe Controls LEFT
  • Please ask for a LIST of remaining items.
Never Used, Zero “0” Hours, built in 2009
124MW GE Frame 9E complete CHP power plant is available for sale immediately. . 50hz. Fuel is n.gas. YOM is 2009. The plant is excellent shape and under power and can be test run  Only serious customer direct contact with end  buyers may contact for further details